The invention discloses a pile leg shifting method. The pile leg comprises a first main group and a second main group. The pile leg shifting method is characterized by comprising the following steps: S1, fixedly connecting the first main group and the second main group so as to finish the assembly of the pile leg; S2, shifting the pile leg to a wharf; and S3, shifting the pile leg to a pile leg fixing position through a lifting sling so as to finish the fixing and mounting of the pile leg. According to the shifting method provided by the invention, the upper and lower two main groups of pile legs are assembled at a time, and then shifted through shifting equipment, such as a docking block and carried by a floating crane together, so that the condition that the pile leg main groups are assembled, shifted and finally mounted at a destination is avoided, and the carrying time of the pile legs can be saved.


    Access

    Download


    Export, share and cite



    Title :

    Pile leg shifting method


    Contributors:
    SHAO DAN (author) / XU ZHANYONG (author) / WANG JIE (author) / ZHANG LIYAN (author) / YE FEI (author) / WU SHIYUAN (author) / LI LAN (author)

    Publication date :

    2015-11-25


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B66C Krane , CRANES



    Energy-saving peak shifting charging pile

    XU HAIYANG / HANG AFANG / TIAN XINGXUAN et al. | European Patent Office | 2022

    Free access

    Peak shifting energy storage charging pile

    MA WENJING / LIU RUI / CUI ZIQUN et al. | European Patent Office | 2023

    Free access

    Charging pile electric energy load peak shifting distribution system

    YAN HUAILUE / XU KANG | European Patent Office | 2022

    Free access

    SHIFTING CONTROLLER AND SHIFTING SYSTEM

    SHAHANA SATOSHI / NAKAJIMA TAKEHIKO / TAKAYAMA HITOSHI | European Patent Office | 2021

    Free access