Engineering and economic aspects of utilizing reheat cycle plant in combination with KaMeWa controllable pitch propeller, based on results of study made by J.J.Henry Co, Aktiebolaget Karlstads Mekaniska Werkstad and Bird-Johnson Co; ship is 90,000 dw ton crude oil tanker with 26,500 shp propulsion plant; for economic comparison, "base ship" is powered with conventional two-boiler, geared steam turbine installation using fourheater regenerative cycle.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Modern 26,500 SHP steam tanker power plant


    Additional title:

    Naval Engrs J


    Contributors:
    Gross, Jr., C.H. (author) / Holm, J.T. (author) / Mende, R.G. (author)

    Published in:

    Publication date :

    1966


    Size :

    10 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Steam Tanker "Pendopo"

    Engineering Index Backfile | 1930


    Modern tanker construction

    Carter, N. | Engineering Index Backfile | 1950


    Modern tanker construction

    Carter, N. | Engineering Index Backfile | 1950


    Modern tanker design

    Pluymert, N.J. | Engineering Index Backfile | 1939


    Modern tanker design

    Pluymert, N.J. | Engineering Index Backfile | 1939