Logistical support of launching of lunar mission Saturn space vehicles from Atlantic Missile Range (AMR) will present major transportation problems; transportation of booster, second and third stages, eventually fourth stage, and payload; part of booster final assembly jig is used to make up transporter assembly; docking operations; launch site and launcher design; liquid-oxygen storage and transfer system; launch site and booster recovery operations.
Saturn ground support and operations
Astronautics
Astronautics ; 5 , n 12
1960
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Saturn V ground-support instrumentation.
NTRS | 1966
|Saturn ground support equipment facilities
Engineering Index Backfile | 1963
|Saturn ground support equipment facilities.
NTRS | 1963
|Saturn s-ic ground support equipment
AIAA | 1965
|Saturn v mechanical ground support equipment.
NTRS | 1965
|