Logistical support of launching of lunar mission Saturn space vehicles from Atlantic Missile Range (AMR) will present major transportation problems; transportation of booster, second and third stages, eventually fourth stage, and payload; part of booster final assembly jig is used to make up transporter assembly; docking operations; launch site and launcher design; liquid-oxygen storage and transfer system; launch site and booster recovery operations.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Saturn ground support and operations


    Weitere Titelangaben:

    Astronautics


    Beteiligte:

    Erschienen in:

    Astronautics ; 5 , n 12


    Erscheinungsdatum :

    1960


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Saturn ground support equipment facilities

    Debus, K.H. | Engineering Index Backfile | 1963


    Saturn V ground-support instrumentation.

    Wilkinson, R. L. | NTRS | 1966



    Saturn s-ic ground support equipment

    CLIFFORD, D. | AIAA | 1965