Project at Fostoria, Ohio, consists of elimination of three railroad grade crossings, together with construction of storm sewer outlets; 48-in. and 60-in. sewer lines had to be tunneled under rail lines; superstructure for railroads consisted of 2-span concrete encased I-beams; girders and steel deck were assembled on rollers and moved into place; description of work which was accomplished "beteen trains".


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Novel underpass methods


    Additional title:

    Roads Streets


    Published in:

    Publication date :

    1953


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    UNDERPASS MONITORING SYSTEM, UNDERPASS MONITORING DEVICE, AND UNDERPASS MONITORING METHOD

    KUWABARA EIJI / FURUKAWA TAKUYA / TANAKA SHINICHI et al. | European Patent Office | 2016

    Free access

    Welded underpass

    Darby, C. | Engineering Index Backfile | 1940


    Underpass train

    HU WEIMIN | European Patent Office | 2015

    Free access

    Strand underpass

    Engineering Index Backfile | 1964


    Wolf point underpass

    Stephenson, R.A. | Engineering Index Backfile | 1940