Project at Fostoria, Ohio, consists of elimination of three railroad grade crossings, together with construction of storm sewer outlets; 48-in. and 60-in. sewer lines had to be tunneled under rail lines; superstructure for railroads consisted of 2-span concrete encased I-beams; girders and steel deck were assembled on rollers and moved into place; description of work which was accomplished "beteen trains".


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Novel underpass methods


    Weitere Titelangaben:

    Roads Streets


    Erschienen in:

    Erscheinungsdatum :

    1953


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    UNDERPASS MONITORING SYSTEM, UNDERPASS MONITORING DEVICE, AND UNDERPASS MONITORING METHOD

    KUWABARA EIJI / FURUKAWA TAKUYA / TANAKA SHINICHI et al. | Europäisches Patentamt | 2016

    Freier Zugriff

    Welded underpass

    Darby, C. | Engineering Index Backfile | 1940


    Strand underpass

    Engineering Index Backfile | 1964


    Underpass train

    HU WEIMIN | Europäisches Patentamt | 2015

    Freier Zugriff

    Wolf point underpass

    Stephenson, R.A. | Engineering Index Backfile | 1940