Methods used in building first three sections of toll expressway of 9. 3 mi total length through some of most rugged coastal terrain in New South Wales, Australia; access to expressway is provided by eight interchanges; climbing lanes are provided where speed of 40,000-lb vehicle falls below 30 mph, traveling either up or down grades; total length of climbing lanes is 10.3 mi; toll collecting facilities are featured.
Construction of Hawkesbury river to calga section of Sydney-newcastle tollway
Instn Engrs, Australia -- J
Institution of Engineers, Australia -- Journal ; 39 , n 1-2
1967
14 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
|ETTM On America's Busiest Tollway
British Library Conference Proceedings | 1993
|Caisson construction -- Hawkesbury River road bridge, N. S. W.
Engineering Index Backfile | 1941
Hawkesbury river railway bridge New South Wales
Engineering Index Backfile | 1945
|Scenarios Developed for Improved Sustainability of Illinois Tollway
Transportation Research Record | 2015
|