Methods used in building first three sections of toll expressway of 9. 3 mi total length through some of most rugged coastal terrain in New South Wales, Australia; access to expressway is provided by eight interchanges; climbing lanes are provided where speed of 40,000-lb vehicle falls below 30 mph, traveling either up or down grades; total length of climbing lanes is 10.3 mi; toll collecting facilities are featured.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Construction of Hawkesbury river to calga section of Sydney-newcastle tollway


    Weitere Titelangaben:

    Instn Engrs, Australia -- J


    Beteiligte:
    Fawkner, G.V. (Autor:in) / Jones, K.T. (Autor:in)


    Erscheinungsdatum :

    1967


    Format / Umfang :

    14 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Illinois Tollway

    Bauch, Jr., W.F. | Engineering Index Backfile | 1960


    ETTM On America's Busiest Tollway

    Hassett, J. J. | British Library Conference Proceedings | 1993



    Hawkesbury river railway bridge New South Wales

    Fewtrell, A.C. | Engineering Index Backfile | 1945


    Scenarios Developed for Improved Sustainability of Illinois Tollway

    Al-Qadi, Imad L. / Yang, Rebekah / Kang, Seunggu et al. | Transportation Research Record | 2015