Problems involved and indication of possible solutions; new types of ships required; cargo warship; speed as measure of defense; submarine and torpedo attack; conversion to post war service; present building capacity; solution to prefabrication problem; best economic use of shipbuilding man hours; increasing power output of approved type; marine Diesel for cargo vessels; airplane engine and its relation to marine engine. (Annual Int No) (See also Inst Mar Engrs -- Trans v 54 n 10, 12 Nov 1942 p 129-46, 1 supp sheet and (discussion) Jan 1943 p 155-89; v 55 n 2, 3, 8, Mar p 23-42, Apr p 48-9, Sept p 140-3 Brit Motor Ship v 23 n 275 Dec 1942 p 293-8, n 276 Jan 1943 p 336-8 and (discussion) n 278 Mar p 406-10; v 24 n 280 May p 58-60, n 281 June p 96-8; Elec Rev v 131 n 3393 Dec 4 1942 p 729-30; Mar Engr v 66 n 78 Mar 1943 p 54-9)
Cargo ships and propelling machinery adapted to war conditions
Shipbldr Mar Engine-Bldr
Shipbuilder and Marine Engine-Builder ; 50 , n 407
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cargo ships and propelling machinery adapted to war conditions
Engineering Index Backfile | 1943
|Cargo ships and propelling machinery adapted to war conditions
Engineering Index Backfile | 1942
|Cargo ships and propelling machinery adapted to war conditions
Engineering Index Backfile | 1943
|Cargo ships and propelling machinery adapted to war conditions
Engineering Index Backfile | 1942
|Propelling machinery for ships
Engineering Index Backfile | 1919
|