On 67 mi of road between Green Island, Ia, and Marion, Milwaukee Road has changed from double track, equipped with automatic block, to single track equipped with centralized traffic control; revised track layouts include power operated switches at ends of double track, at junction and at two ends of six sidings; intermediate signals spaced 2.5 to 3 mi apart are arranged as double locations. (See also Ry Age v 130 n 8 Feb 26 1951 p 26-7)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Single track with C.T.C. replaces double track on Milwaukee


    Additional title:

    Ry Signaling Communications


    Published in:

    Publication date :

    1951


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    C.T.C. replaces staff on Milwaukee

    Engineering Index Backfile | 1934


    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938


    C.T.C. replaces manual block on single track

    Engineering Index Backfile | 1953


    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938


    Double to single track with C.T.C.

    Engineering Index Backfile | 1950