Installation of centralized-traffic-control system, including spring switch, to replace staff system on 3 mi of single track between Beloit, Wis, and Rockton, Ill, in which train movements are expedited and operating expenses reduced; system also extends 1 mi eastward from Beloit to include operation of signals at Beloit Junction.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    C.T.C. replaces staff on Milwaukee


    Additional title:

    Ry Signaling


    Published in:

    Publication date :

    1934


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938


    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938



    C.T.C. signaling installed on Milwaukee

    Engineering Index Backfile | 1942


    C.T.C. signaling installed on Milwaukee

    Engineering Index Backfile | 1942