Installation of centralized-traffic-control system, including spring switch, to replace staff system on 3 mi of single track between Beloit, Wis, and Rockton, Ill, in which train movements are expedited and operating expenses reduced; system also extends 1 mi eastward from Beloit to include operation of signals at Beloit Junction.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    C.T.C. replaces staff on Milwaukee


    Weitere Titelangaben:

    Ry Signaling


    Erschienen in:

    Erscheinungsdatum :

    1934


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938


    C.T.C. replaces staff system on Milwaukee

    Engineering Index Backfile | 1938



    C.T.C. signaling installed on Milwaukee

    Engineering Index Backfile | 1942


    C.T.C. signaling installed on Milwaukee

    Engineering Index Backfile | 1942