Discussion of methods devised by Pennsylvania Railroad in carrying out this project at Harrisburg, Pa, thus obtaining additional under-clearance needed for electrified operation; plate girder bridge spans eight tracks.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Raising long passenger bridge under traffic no easy task


    Additional title:

    Ry Age


    Published in:

    Railway Age ; 107 , n 17


    Publication date :

    1939


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Raising a three-span bridge under traffic

    Engineering Index Backfile | 1916


    Simulation of traffic organization with raising the speed of passenger trains

    Xu, Ruihua / Ji, Ling / Wu, Xiang | Tema Archive | 1998


    Simulation of Traffic Organization with Raising the Speed of Passenger Trains

    Xu, R. / Ji, L. / Wu, X. | British Library Conference Proceedings | 1998


    Passenger bridge

    THELANDER PER | European Patent Office | 2023

    Free access

    Passenger bridge

    THELANDER PER | European Patent Office | 2023

    Free access