Discussion of methods devised by Pennsylvania Railroad in carrying out this project at Harrisburg, Pa, thus obtaining additional under-clearance needed for electrified operation; plate girder bridge spans eight tracks.
Raising long passenger bridge under traffic no easy task
Ry Age
Railway Age ; 107 , n 17
1939
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Raising a three-span bridge under traffic
Engineering Index Backfile | 1916
Simulation of traffic organization with raising the speed of passenger trains
Tema Archiv | 1998
|Simulation of Traffic Organization with Raising the Speed of Passenger Trains
British Library Conference Proceedings | 1998
|