Discussion of methods devised by Pennsylvania Railroad in carrying out this project at Harrisburg, Pa, thus obtaining additional under-clearance needed for electrified operation; plate girder bridge spans eight tracks.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Raising long passenger bridge under traffic no easy task


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 107 , n 17


    Erscheinungsdatum :

    1939


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Raising a three-span bridge under traffic

    Engineering Index Backfile | 1916


    Simulation of traffic organization with raising the speed of passenger trains

    Xu, Ruihua / Ji, Ling / Wu, Xiang | Tema Archiv | 1998


    Simulation of Traffic Organization with Raising the Speed of Passenger Trains

    Xu, R. / Ji, L. / Wu, X. | British Library Conference Proceedings | 1998


    PASSENGER BRIDGE

    THELANDER PER | Europäisches Patentamt | 2023

    Freier Zugriff

    Passenger bridge

    THELANDER PER | Europäisches Patentamt | 2023

    Freier Zugriff