To solve problems of need for larger drainage opening under track on Great Northern Railway, liner plates for 120-in. culvert were installed by tunneling operation using special jacking frame; additional opening through fill permitted water levels on each side of track to be equalized more quickly, eliminating possibility of washouts.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Poling plates help get big culvert through fill


    Additional title:

    Ry Track Structures


    Published in:

    Publication date :

    1958


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Jacking culvert through railway fill aided by top shield

    Tunnicliff, N.H. | Engineering Index Backfile | 1928


    Crawler crawling robot for detection of culvert with top-fill

    TANG LI / ZHANG YUNGUANG / HE SHAOBO et al. | European Patent Office | 2020

    Free access

    Analysis Research on Little Curvature Arch Bar of High Fill Culvert

    Wang, W.-H. / Ju, Y.-H. / Zhao, W.-D. et al. | British Library Conference Proceedings | 2010


    Culvert hydraulics

    Engineering Index Backfile | 1953


    Culvert Hydraulics

    Hotchkiss, Rollin H. / Thiele, Elizabeth A. / Nelson, E. James et al. | Transportation Research Record | 2008