Layout installed at Gould, Ohio, near Toledo, to direct train operation over new track layout, including both junctions and crossings, and joint track arrangements involving four roads; control arrangement includes regular electric interlocking for nearby functions, as well as separate levers for those more remote. (see also Ry Signaling v 26 n 10 Oct 1933 p 267-70)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Interlocking six miles long


    Additional title:

    Ry Age


    Contributors:

    Published in:

    Railway Age ; 95 , n 23


    Publication date :

    1933


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Interlocking six miles long

    Oppelt, J.H. | Engineering Index Backfile | 1933


    Interlocking 1.5 miles long on S.P.

    Engineering Index Backfile | 1935


    Interlocking three miles long on Burlington

    Zane, W.F. | Engineering Index Backfile | 1938


    Interlocking three miles long on Burlington

    Zane, W.F. | Engineering Index Backfile | 1938