As means of reducing delays to through trains while picking up or setting out cars, servicing locomotives and changing crews, Burlington Railroad has extended second track through Hastings, Neb, and has installed new signaling arrangement and interlocking 3 mi long which is controlled by miniature lever type machine with code type control circuits; track and signal plan given.
Interlocking three miles long on Burlington
Ry Age
Railway Age ; 105 , n 10
1938
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Interlocking three miles long on Burlington
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1933
|Engineering Index Backfile | 1933
|Interlocking three miles long on Chesapeake and Ohio
Engineering Index Backfile | 1934
Interlocking 1.5 miles long on S.P.
Engineering Index Backfile | 1935