Layout installed at Gould, Ohio, near Toledo, to direct train operation over new track layout, including both junctions and crossings, and joint track arrangements involving four roads; control arrangement includes regular electric interlocking for nearby functions, as well as separate levers for those more remote. (See also Ry Age v 95 n 23 Dec 2 1933 p 782-3)
Interlocking six miles long
Ry Signaling
Railway Signaling ; 26 , n 10
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Interlocking three miles long on Burlington
Engineering Index Backfile | 1938
|Interlocking three miles long on Burlington
Engineering Index Backfile | 1938
|Long term test - Porsche Boxster at 7500 miles - Alfa 156 at 6000 miles
Automotive engineering | 1998
|Extensive interlocking at Jamaica, Long Island
Engineering Index Backfile | 1914
Electro-pneumatic interlocking on Long Island
Engineering Index Backfile | 1934