Inspection, preparation and workmanship employed on New York Central to obtain max benefit; preliminaryinspection considered essential; first welding on 105-lb rail; equipment and organization.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Building up rail ends with electric arc


    Additional title:

    Ry Eng Maintenance


    Published in:

    Publication date :

    1933


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Building-up rail ends with multiple-flame torches

    Engineering Index Backfile | 1938


    Building-up rail ends with multiple-flame torches

    Engineering Index Backfile | 1938


    Building up and heat treating rail ends

    Constance, W. | Engineering Index Backfile | 1932


    Reconditioning rail ends

    Howe, C.H.R. | Engineering Index Backfile | 1935


    Reconditioning rail ends

    Hartley, J.C. | Engineering Index Backfile | 1934