Inspection, preparation and workmanship employed on New York Central to obtain max benefit; preliminaryinspection considered essential; first welding on 105-lb rail; equipment and organization.
Building up rail ends with electric arc
Ry Eng Maintenance
Railway Engineering and Maintenance ; 29 , n 2
1933
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building-up rail ends with multiple-flame torches
Engineering Index Backfile | 1938
Building-up rail ends with multiple-flame torches
Engineering Index Backfile | 1938
Building up and heat treating rail ends
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1935
|Engineering Index Backfile | 1934
|