Inspection, preparation and workmanship employed on New York Central to obtain max benefit; preliminaryinspection considered essential; first welding on 105-lb rail; equipment and organization.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Building up rail ends with electric arc


    Weitere Titelangaben:

    Ry Eng Maintenance


    Erschienen in:

    Erscheinungsdatum :

    1933


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Building-up rail ends with multiple-flame torches

    Engineering Index Backfile | 1938


    Building-up rail ends with multiple-flame torches

    Engineering Index Backfile | 1938


    Building up and heat treating rail ends

    Constance, W. | Engineering Index Backfile | 1932


    Reconditioning rail ends

    Howe, C.H.R. | Engineering Index Backfile | 1935


    Reconditioning rail ends

    Hartley, J.C. | Engineering Index Backfile | 1934