Account of steady development of this system, both quantitatively and qualitatively; new installation on Maloja increased performance of ship from 14,000 to 17,500 hp. with same fuel consumption; recent installations on other vessels; descriptions of system have been previously indexed from various sources, but operating experiences in past few years have led to improvements here described.
Further development of Bauer-Wach system of exhaust-steam turbine
Ueber die weitere Entwicklung der Abdampfturbine System Bauer-Wach
Schiffbau und Schiffahrt ; 31 , n 12
1930
8 pages
6 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Development of the Bauer-Wach exhaust turbine
Engineering Index Backfile | 1928
|Steamship "crofter" with bauer-wach exhaust turbine
Engineering Index Backfile | 1952
Bauer-Wach exhaust turbine installation of tanker pan bolivar
Engineering Index Backfile | 1932
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1933
|