Review of progress made in Bauer-Wach system of ship propulsion; since first installation in 1927, 32 new ships have been equipped with this system and there had been 33 conversions of older vessels; advantages of combined reciprocating engines and exhaust turbine are set forth in detail.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Development of the Bauer-Wach exhaust turbine


    Additional title:

    Die Entwicklung der Bauer-Wach-Abdampfturbine


    Contributors:
    Schlupp, W. (author)

    Published in:

    Schiffbau ; 29 , n 11


    Publication date :

    1928


    Size :

    10 pages


    Remarks:

    17 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German





    Further development of Bauer-Wach system of exhaust-steam turbine

    Bauer, G. | Engineering Index Backfile | 1930



    Bauer-Wach installation

    Gelhaus, H.F. | Engineering Index Backfile | 1933


    Bauer-Wach installation

    Gelhaus, H.F. | Engineering Index Backfile | 1933