Introduction of belt system of building and repairing locomotives; time for heavy locomotive overhaul reduced to maximum of 12 working days; describes in detail investigation made upon spot of complete reorganization carried out during past three years at works of L.M.S. railway; belt system; schedule of material required at various stages of belt.
Reorganization of Crewe Locomotive Works, L.M.S.R.
Ry Gaz
Railway Gazette and Railway News ; 49 , n 1
1928
8 pages
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reorganization of crewe locomotive works, L.M.S.R.
Engineering Index Backfile | 1928
Reorganization of crewe locomotive works, L.M.S.R.
Engineering Index Backfile | 1928
Transportation methods at Crewe Locomotive Works, L.M.S.R.
Engineering Index Backfile | 1928
The reorganization of Crewe Locomotive Works
Engineering Index Backfile | 1928
|The reorganization of Crewe Locomotive Works
Engineering Index Backfile | 1928
|