Introduction of belt system of building and repairing locomotives; time for heavy locomotive overhaul reduced to maximum of 12 working days; describes in detail investigation made upon spot of complete reorganization carried out during past three years at works of L.M.S. railway; belt system; schedule of material required at various stages of belt.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Reorganization of Crewe Locomotive Works, L.M.S.R.


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Erscheinungsdatum :

    1928


    Format / Umfang :

    8 pages


    Anmerkungen:

    15 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :





    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928