July: One large shop equipped with largest appliances replaces nine older erecting shops; processing or belt system of building and repairing locomotives introduced; production and transport methods reorganized; time for heavy locomotive overhaul reduced to maximum of 12 working days; how engines enter and leave shop; progress office; controlling factor; recording system; sequence of operation. (See also - no. 583 Aug. pp. 277-290 no. 584 Sept., pp. 317-326, no. 585 Oct., pp. 361-364, no. 586 Nov., pp. 400-406, 412, no. 587 Dec pp. 448-456, 125 figs.)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Reorganization of crewe locomotive works, L.M.S.R.


    Weitere Titelangaben:

    Ry Engr


    Erschienen in:

    Railway Engineer ; 49 , n 482


    Erscheinungsdatum :

    1928


    Format / Umfang :

    20 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :