July: One large shop equipped with largest appliances replaces nine older erecting shops; processing or belt system of building and repairing locomotives introduced; production and transport methods reorganized; time for heavy locomotive overhaul reduced to maximum of 12 working days; how engines enter and leave shop; progress office; controlling factor; recording system; sequence of operation. (See also - no. 583 Aug. pp. 277-290 no. 584 Sept., pp. 317-326, no. 585 Oct., pp. 361-364, no. 586 Nov., pp. 400-406, 412, no. 587 Dec pp. 448-456, 125 figs.)
Reorganization of crewe locomotive works, L.M.S.R.
Ry Engr
Railway Engineer ; 49 , n 482
1928
20 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reorganization of Crewe Locomotive Works, L.M.S.R.
Engineering Index Backfile | 1928
Reorganization of crewe locomotive works, L.M.S.R.
Engineering Index Backfile | 1928
Reorganization of crewe locomotive works, L.M.S.R.
Engineering Index Backfile | 1928
Reorganization of crewe locomotive works, L.M.S.R.
Engineering Index Backfile | 1928
Reorganization of crewe locomotive works, L.M.S.R.
Engineering Index Backfile | 1928