Train running between Euston and Glasgow works on schedule of 6 1/2 hr maintained by three new nine-coach trains hauled by class of five new 4-6-2 streamlined locomotives; locomotives exert tractive effort at 85% of boiler pressure, of 40,000 lb; capable of max speeds in excess of 100 mph. (see also Engineer v 163 n 4247 June 4 1937 p 651 and 650; Ry Gaz v 66 n 22 May 28 1937 p 1019-30)
"Coronation scot" express, L.M.S. railway
Engineering
Engineering ; 143 , n 3725
1937
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
"Coronation scot" express, L.M.S. railway
Engineering Index Backfile | 1937
Rebuilt "Royal scot" locomotives; L.M.S. railway
Engineering Index Backfile | 1943
Rebuilt "Royal scot" locomotives; L.M.S. railway
Engineering Index Backfile | 1943
Rebuilt "Royal scot" locomotives; L.M.S. railway
Engineering Index Backfile | 1943
Engineering Index Backfile | 1930