Train running between Euston and Glasgow works on schedule of 6 1/2 hr maintained by three new nine-coach trains hauled by class of five new 4-6-2 streamlined locomotives; locomotives exert tractive effort at 85% of boiler pressure, of 40,000 lb; capable of max speeds in excess of 100 mph. (See also Engineering v 143 n 3725 June 4 1937 p 633-5; Ry Gaz v 66 n 22 May 28 1937 p 1019-30)
"Coronation scot" express, L.M.S. railway
Engineer
Engineer ; 163 , n 4247
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rebuilt "Royal scot" locomotives; L.M.S. railway
Engineering Index Backfile | 1943
Rebuilt "Royal scot" locomotives; L.M.S. railway
Engineering Index Backfile | 1943
New L.M.S. "coronation" locomotives
Engineering Index Backfile | 1937
New L.M.S. "coronation" locomotives
Engineering Index Backfile | 1937
Engineering Index Backfile | 1933