Train running between Euston and Glasgow works on schedule of 6 1/2 hr maintained by three new nine-coach trains hauled by class of five new 4-6-2 streamlined locomotives; locomotives exert tractive effort at 85% of boiler pressure, of 40,000 lb; capable of max speeds in excess of 100 mph. (see also Engineer v 163 n 4247 June 4 1937 p 651 and 650; Ry Gaz v 66 n 22 May 28 1937 p 1019-30)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    "Coronation scot" express, L.M.S. railway


    Weitere Titelangaben:

    Engineering


    Erschienen in:

    Engineering ; 143 , n 3725


    Erscheinungsdatum :

    1937


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    "Coronation scot" express, L.M.S. railway

    Engineering Index Backfile | 1937


    Rebuilt "Royal scot" locomotives; L.M.S. railway

    Engineering Index Backfile | 1943


    Rebuilt "Royal scot" locomotives; L.M.S. railway

    Engineering Index Backfile | 1943


    Rebuilt "Royal scot" locomotives; L.M.S. railway

    Engineering Index Backfile | 1943


    Research on L.M.S. railway

    Hartley, H. | Engineering Index Backfile | 1932