Construction of new bridge consisting of two spans 41 ft 9 in. and 9 ft 6 in., carrying Piccadilly line of London Passenger Transport Board over ticket hall of South Harrow station; bridge was constructed complete in temporary position adjacent to tracks, and during Sunday possession of line it was rolled into position. (See also - n 8 Oct 1938 discussion p 377)
Pre-cast reinforced-concrete underline railway bridge
Instn Civ Engrs -- J
1937
10 pages
Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pre-cast reinforced-concrete underline railway bridge
Engineering Index Backfile | 1937
|Mass-produced underline bridges
Engineering Index Backfile | 1943
Tema Archive | 1995
|Reinforced concrete in railway bridge work
Engineering Index Backfile | 1914
Investigation of full-size reinforced concrete railway bridge slabs
Engineering Index Backfile | 1957