Construction of new bridge consisting of two spans 41 ft 9 in. and 9 ft 6 in., carrying Piccadilly line of London Passenger Transport Board over ticket hall of South Harrow station; bridge was constructed complete in temporary position adjacent to tracks, and during Sunday possession of line it was rolled into position. (See also - n 8 Oct 1938 discussion p 377)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Pre-cast reinforced-concrete underline railway bridge


    Weitere Titelangaben:

    Instn Civ Engrs -- J


    Beteiligte:


    Erscheinungsdatum :

    1937


    Format / Umfang :

    10 pages


    Anmerkungen:

    Supp plates


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Pre-cast reinforced-concrete underline railway bridge

    Follenfant, H.G. | Engineering Index Backfile | 1937


    Mass-produced underline bridges

    Engineering Index Backfile | 1943


    Silver Street underline

    Veale, P. / Pollard, K. | Tema Archiv | 1995


    Reinforced concrete in railway bridge work

    Engineering Index Backfile | 1914