Replacement of 1200 lin. ft. of track on Euclid Avenue in business section of Cleveland was completed in 49 hr.; breakdown of equipment during work was avoided by careful inspection prior to start: operations were arranged to follow each other in close sequence; vehicular traffic suffered no interruption.
Accurate work schedules permit speedy track reconstruction
Elec. Ry. Jl
Electric Railway Journal ; 74 , n 5
1930
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2001
New track construction methods prove speedy and economical
Engineering Index Backfile | 1930
|Beaufort Relies on DEA for Speedy, Accurate Inspection
Emerald Group Publishing | 1992
Kamal Rahman:Peril in the work permit minefield
British Library Online Contents | 2003
Contractors UK firms flout work permit rules
British Library Online Contents | 2003