Replacement of 1200 lin. ft. of track on Euclid Avenue in business section of Cleveland was completed in 49 hr.; breakdown of equipment during work was avoided by careful inspection prior to start: operations were arranged to follow each other in close sequence; vehicular traffic suffered no interruption.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Accurate work schedules permit speedy track reconstruction


    Weitere Titelangaben:

    Elec. Ry. Jl


    Beteiligte:
    George, H.H. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1930


    Format / Umfang :

    3 pages


    Anmerkungen:

    5 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Permit to Work

    Online Contents | 2001


    New track construction methods prove speedy and economical

    Dalgleish, R.H. | Engineering Index Backfile | 1930



    Kamal Rahman:Peril in the work permit minefield

    British Library Online Contents | 2003


    Contractors UK firms flout work permit rules

    British Library Online Contents | 2003