How move of steel span bridge on Missouri Pacific that was required by line-relocation job was carried out by hauling girders one by one on flat car while deck systems were supported on temporary false work at old and new locations is described.
Falsework carries traffic as girder span goes to new site
Ry Track Structures
Railway Track and Structures ; 60 , n 9
1964
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rolling 400-ton railway span into position from falsework
Engineering Index Backfile | 1933
|Engineering Index Backfile | 1893
Bailey falsework for truss bridge repairs
Engineering Index Backfile | 1950
|Record plate-girder bridge span
Engineering Index Backfile | 1931
|Record plate-girder bridge span
Engineering Index Backfile | 1931
|