How move of steel span bridge on Missouri Pacific that was required by line-relocation job was carried out by hauling girders one by one on flat car while deck systems were supported on temporary false work at old and new locations is described.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Falsework carries traffic as girder span goes to new site


    Weitere Titelangaben:

    Ry Track Structures


    Erschienen in:

    Erscheinungsdatum :

    1964


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Rolling 400-ton railway span into position from falsework

    Taylor, G.B. | Engineering Index Backfile | 1933


    Falsework for erection

    Engineering Index Backfile | 1893


    Bailey falsework for truss bridge repairs

    Patchett, C.M. | Engineering Index Backfile | 1950


    Record plate-girder bridge span

    Hardesty, S. | Engineering Index Backfile | 1931


    Record plate-girder bridge span

    Skinner, F.W. | Engineering Index Backfile | 1931