Erection of new plate-girder span, weighing 400 tons, carrying tracks of New York, New Haven and Hartford Railroad over Connecticut state highway No. 108, at Buckland, Conn; falsework and grillage arrangement used in rolling into position.
Rolling 400-ton railway span into position from falsework
Eng News-Rec
Engineering News-Record ; 110 , n 24
1933
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Falsework carries traffic as girder span goes to new site
Engineering Index Backfile | 1964
Engineering Index Backfile | 1893
Short-span railway rolling-lift bascule bridge
Engineering Index Backfile | 1927
Bailey falsework for truss bridge repairs
Engineering Index Backfile | 1950
|Erecting seven simple spans without falsework
Engineering Index Backfile | 1924