Transportation and erection of two 84-ton plate girders 154 ft. long and 12 ft. deep for approach to highway span over Maumee river at Toledo, Ohio. (similar description) (See also Eng. and Contracting, vol. 70, no. 7, July 1931, pp. 161-163, 6 figs.; Roads and Streets, vol. 71, no. 7, July 1931, pp. 259-260, 6 figs., and Can. Engr., vol. 61, no. 17, Oct. 27, 1931, pp. 19-20, 3 figs)
Record plate-girder bridge span
Eng. News-Rec
Engineering News-Record ; 107 , n 12
1931
2 pages
2 Figs
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Record plate-girder bridge span
Engineering Index Backfile | 1931
|Record plate-girder bridge span
Engineering Index Backfile | 1931
|Record plate-girder bridge span
Engineering Index Backfile | 1931
|Railroad bridge forces erect heavy girder span
Engineering Index Backfile | 1926
A long double-track plate-girder span
Engineering Index Backfile | 1899