Construction methods employed, both for timber-crib and for rubble-mound type; methods of transportation and handling adopted to meet special conditions of Lake Superior port. (See also - (discussion) p 224-226; Engineering, vol. 13, no. 3406, Apr. 24, 1931, p. 543)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Breakwater construction in Port Arthur harbour


    Additional title:

    Eng. Jl.


    Contributors:

    Published in:

    Publication date :

    1931


    Size :

    10 pages


    Remarks:

    14 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Breakwater construction in Port Arthur harbour

    Harcourt, F.Y. | Engineering Index Backfile | 1931


    Smart Port Breakwater Design and Construction

    Shaw, Reece F. / Goreau, Thomas J. | ASCE | 2016


    Breakwater for Service Harbour, Gulf of Aden

    Allyn, Norman / Quick, Michael / Condon, Ed et al. | ASCE | 2004


    The Lama Breakwater, Western Harbour, Hong Kong

    Rowe, H. J. D. / Ligteringen, H. / Hong Kong Institution of Engineers | British Library Conference Proceedings | 1992


    Optimal breakwater design for the Rotterdam harbour extension

    Voortman, H. G. / Vrijling, J. K. / Boer, S. et al. | British Library Conference Proceedings | 1999