Construction methods employed, both for timber-crib and for rubble-mound type; methods of transportation and handling adopted to meet special conditions of Lake Superior port. (See also Eng. Jl vol. 14, no. 4, Apr. 1931 pp. 215-224 (discussion) p 224-226, 14 figs)
Breakwater construction in Port Arthur harbour
Engineering
Engineering ; 13 , n 3406
1931
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Breakwater construction in Port Arthur harbour
Engineering Index Backfile | 1931
|Smart Port Breakwater Design and Construction
ASCE | 2016
|The Lama Breakwater, Western Harbour, Hong Kong
British Library Conference Proceedings | 1992
|Breakwater for Service Harbour, Gulf of Aden
ASCE | 2004
|Optimal breakwater design for the Rotterdam harbour extension
British Library Conference Proceedings | 1999
|