Construction methods employed, both for timber-crib and for rubble-mound type; methods of transportation and handling adopted to meet special conditions of Lake Superior port. (See also - (discussion) p 224-226; Engineering, vol. 13, no. 3406, Apr. 24, 1931, p. 543)
Breakwater construction in Port Arthur harbour
Eng. Jl.
Engineering Journal ; 14 , n 4
1931
10 pages
14 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Breakwater construction in Port Arthur harbour
Engineering Index Backfile | 1931
|Smart Port Breakwater Design and Construction
ASCE | 2016
|The Lama Breakwater, Western Harbour, Hong Kong
British Library Conference Proceedings | 1992
|Breakwater for Service Harbour, Gulf of Aden
ASCE | 2004
|Optimal breakwater design for the Rotterdam harbour extension
British Library Conference Proceedings | 1999
|