In Strowger-Hudd system permanent magnets and electromagnets are used to operate receivers carried by locomotive, which cause whistle to be blown and continuous brake to be applied as required; receivers are actuated by inductors, of which there are usually three. (See also Engineer vol. 152, no. 3950, Sept. 25, 1931 pp. 332-333, 8 figs; Engineering, vol. 132, no. 3438, Dec. 4, 1931, p. 710, 1 fig.; and Elecn., vol. 107, no. 2788, Nov. 6, 1931, p. 623, 3 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Automatic train control on southern railway


    Additional title:

    Ry. Gaz.


    Published in:

    Railway Gazette ; 55 , n 14


    Publication date :

    1931


    Size :

    5 pages


    Remarks:

    10 figs


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Automatic train control on southern railway

    Engineering Index Backfile | 1931


    Automatic train control on southern railway

    Engineering Index Backfile | 1931


    Automatic train control on southern railway

    Engineering Index Backfile | 1931


    Southern railway train ferries

    Engineering Index Backfile | 1934


    Southern railway train ferries

    Engineering Index Backfile | 1934