Missouri Pacific has installed centralized traffic control on 38 mi between Raddle, Ill and Gale; project includes double crossover layouts, spaced about six to eight miles apart; both tracks are signaled in both directions so that faster trains run around slower ones, thus avoiding delay on sidings. (See also Ry Signaling and Communications v 47 n 3 Mar 1954 p 48-42)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    CTC increases capacity of double track


    Additional title:

    Ry Age


    Published in:

    Railway Age ; 136 , n 5


    Publication date :

    1954


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    CTC increases capacity of double track

    Engineering Index Backfile | 1954



    C.T.C. increases capacity of single-track

    Engineering Index Backfile | 1938


    C.T.C. increases capacity of single-track

    Engineering Index Backfile | 1938