Centralized traffic control installed by Pennsylvania Railroad for control of switches and signals at each end of 4.5 mi of single track between Huntley, Pa, and Sterling Run, on Renovo division; installation includes power switch machines and signals for directing train movements at these locations; two double locations of automatic block signals installed on single track section.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    C.T.C. increases capacity of single-track


    Additional title:

    Ry Age


    Published in:

    Railway Age ; 104 , n 2


    Publication date :

    1938


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English