Missouri Pacific has installed centralized traffic control on 38 mi between Raddle, Ill and Gale; project includes double crossover layouts, spaced about six to eight miles apart; both tracks are signaled in both directions so that faster trains run around slower ones, thus avoiding delay on sidings. (See also Ry Signaling and Communications v 47 n 3 Mar 1954 p 48-42)
CTC increases capacity of double track
Ry Age
Railway Age ; 136 , n 5
1954
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
CTC increases capacity of double track
Engineering Index Backfile | 1954
Erie increases track capacity on busy section of double track
Engineering Index Backfile | 1931
C.T.C. increases capacity of single-track
Engineering Index Backfile | 1938
C.T.C. increases capacity of single-track
Engineering Index Backfile | 1938
New track bringing more capacity to handle increases
Online Contents | 1995