New mechanical plant and centralized-traffic-control installation solve problem on Delaware division of Erie; track and signal plan showing only interlocked and controlled signals at Lackawaxen Tusten and Nobody; electromechanical plant and centralized control.
Erie increases track capacity on busy section of double track
Ry. Signaling
Railway Signaling ; 24 , n 8
1931
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Double-track work on a busy section of the Erie railroad
Engineering Index Backfile | 1917
Engineering Index Backfile | 1887
Double to single track 60 miles on Erie
Engineering Index Backfile | 1951
Why Erie has converted 57 miles of double track to single track
Engineering Index Backfile | 1951
Engineering Index Backfile | 1912
|