Central Argentine Railway consists of 3305 route-miles; introduction of central control in 1919; communications; central-control organization; train control; switching services and Vermont tractor; time tables; freight haulage; economics and improvement made possible under system; train loading. Abstract.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Traffic control on the Central Argentine railway


    Additional title:

    Inst. Transport -- Jl


    Contributors:
    Goddard, P. (author)

    Published in:

    Publication date :

    1928


    Size :

    6 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Traffic control, Central Argentine Railway

    Goddard, P. | Engineering Index Backfile | 1928


    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929


    The Central argentine railway

    Engineering Index Backfile | 1929