Details of Buenos Aires suburban-line electrification extension requiring 20,000-kw. new automatic converter substation to be supplied at 20,000-volt 25-cycle three-phase current; lines will be operated at 800 volts d.c. third rail system. (See also Elec. Rev vol. 104, no. 2683, Apr. 26, 1929 pp. 729-731, 5 figs; Ry. Gaz., vol. 50, no. 21, May 24, 1929, pp. 774-775, 4 figs.; Tramway and Ry. World, vol. 65, no. 24, May 16, 1929, pp. 257-259, 5 figs.; Metropolitan Vickers Gaz., vol. 11, no. 196, July 1929, pp. 308-310,5 figs.)
The Central argentine railway
Elec. Ry., Bus Tram Jl
Electric Railway, Bus and Tram Journal ; 60 , n 1509
1929
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Central Argentine railway electrification
Engineering Index Backfile | 1935