Details of Buenos Aires suburban-line electrification extension requiring 20,000-kw. new automatic converter substation to be supplied at 20,000-volt 25-cycle three-phase current; lines will be operated at 800 volts d.c. third rail system. (see also Ry. Gaz., vol. 50, no. 21, May 24, 1929, pp. 774-775, 4 figs.; Tramway and Ry. World, vol. 65, no. 24, May 16, 1929, pp. 257-259, 5 figs.; Metropolitan Vickers Gaz., vol. 11, no. 196, July 1929, pp. 308-310, 5 figs.; and Elec. Ry., Bus and Tram Jl, vol. 60, no. 1509, June 14, 1929, pp. 351-352, 4 figs)
The Central argentine railway
Elec. Rev
Electrical Review ; 104 , n 2683
1929
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Central Argentine railway electrification
Engineering Index Backfile | 1935