How main was extended under Cleveland's principal traffic artery to serve buildings on other side of avenue; pit 6.5 by 15 ft was excavated at curb line from which 3-ft diam tunnel was started to extend to manhole directly across street, distance of 82 ft; illustrated description. (See also Eng News-Rec v 140 n 22 May 27 1948 p 772-4)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    City steam line tunneled beneath heavily traveled six-lane street


    Additional title:

    Heating Vent


    Contributors:

    Published in:

    Publication date :

    1948


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    City steam line tunneled beneath heavily traveled six-lane street

    Hamlin, G.W. | Engineering Index Backfile | 1948


    Traffic signal control of heavily traveled intersection

    Mitchell, R.A. | Engineering Index Backfile | 1937



    Method for assigning traffic lane currently traveled by vehicle

    GLASER STEFAN / REIMANN DANIEL / FADLER ANDREAS et al. | European Patent Office | 2022

    Free access