Description of project involving laying of two lengths of 52-conductor submarine cable, aggregating 2615 ft, across Hackensack river, 5.5 mi west of Erie Railroad passenger station at Jersey City, NJ; entire operation, from time cable was loaded on trucks at plant where it was manufactured until it was laid across river, ready for connection, required only 6 1/2 hr.
Fast work laying submarine cable
Ry Signaling Communications
Railway Signaling and Communications ; 42 , n 6
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
|Submarine cable laying ship cable turntable and cable laying machine control device
European Patent Office | 2021
|Naval experience in laying submarine cable
Engineering Index Backfile | 1925
|