Description of project involving laying of two lengths of 52-conductor submarine cable, aggregating 2615 ft, across Hackensack river, 5.5 mi west of Erie Railroad passenger station at Jersey City, NJ; entire operation, from time cable was loaded on trucks at plant where it was manufactured until it was laid across river, ready for connection, required only 6 1/2 hr.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Fast work laying submarine cable


    Weitere Titelangaben:

    Ry Signaling Communications


    Erschienen in:

    Erscheinungsdatum :

    1949


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Laying equipment of submarine cable

    Europäisches Patentamt | 2023

    Freier Zugriff

    Laying equipment of submarine cable

    LEE SANG IL / LEE JANG HO / LEE PONG KI | Europäisches Patentamt | 2022

    Freier Zugriff

    Submarine cable laying ship cable turntable and cable laying machine control device

    ZHANG JUNJIAN / GENG LIGUO / ZHAO WEIJUN et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    SUBMARINE STRATUM SPACE CABLE LAYING ROBOT

    CHEN JIAWANG / ZHANG PEIHAO / LIN XINGSHUANG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Laying submarine cable across the Mississippi

    Moore, L.D. | Engineering Index Backfile | 1924